InstaVolt Ltd · EV charging site
Lanark Filling Station
30A West Port, Dalserf, ML11 9HE
Lanark Filling Station is an EV charging site in Dalserf, South Lanarkshire, run by InstaVolt Ltd. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.75/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Cairn Lodge Services (Evolt), 6.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lanark Filling Station (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Lanark Filling Station (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Lanark Filling Station (InstaVolt Ltd) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Lanark Filling Station?
Lanark Filling Station is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Lanark Filling Station (InstaVolt Ltd)?
Cairn Lodge Services (Evolt) is 6.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lanark Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lanark Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lanark Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bernards Wynd Car Park, Lanark
- Pod Point Tesco Superstore - Lanark Gallowhill Road
- South Vennel, Lanark
- Glebe Drive Car Park, Lanark (1)
- Lanark Railway Station, Lanark
- Cheapest nearby
- Pod Point Tesco Superstore - Lanark Gallowhill Road · 44.4p per kWh · 7 kW · 0.3 mi