Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

South Vennel, Lanark

South Vennel, Dalserf, ML11 7JT

South Vennel, Lanark is an EV charging site in Dalserf, South Lanarkshire. It has a single 8 kW Type 2 socket. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lanark Filling Station (InstaVolt Ltd), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 10 Sept 2013Last verified 10 Sept 2013

Connectors

Type 2 · 8 kW1 connector

Site information

Opening hours
Not published
Access
Private · membership required
Getting there
Phone Adam Beattie on 01698 453698 for access

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 8 kW Type 2~6h 55m
Tesla Model 3 Rear-Wheel Drive 10–80% · 8 kW Type 2~4h 59m
Audi Q4 e-tron 50 10–80% · 8 kW Type 2~6h 23m
Hyundai IONIQ 5 10–80% · 8 kW Type 2~6h 21m
MG Motor MG4 Trophy 10–80% · 8 kW Type 2~5h 20m
Hyundai Kona Electric Long Range 10–80% · 8 kW Type 2~5h 38m
Nissan LEAF 10–80% · 8 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at South Vennel, Lanark?

Up to 8 kW AC via Type 2.

How many charging sockets does South Vennel, Lanark have?

1 charging socket: 1 × 8 kW Type 2.

Can anyone charge at South Vennel, Lanark?

The operator lists this charger as private - access is restricted.

Where is the nearest charger with 50 kW or more to South Vennel, Lanark?

Lanark Filling Station (InstaVolt Ltd) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at South Vennel, Lanark?

A 10–80% charge takes about 6h 55m on the 8 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Vennel, Lanark?

A 10–80% charge takes about 4h 59m on the 8 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at South Vennel, Lanark?

A 10–80% charge takes about 6h 23m on the 8 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 10 Sept 2013

Amp Map does not take payment. You pay the operator.