InstaVolt Ltd · EV charging site
McDonald's Catterick - Garrison
Gough Road, Northallerton, DL9 3AE
McDonald's Catterick - Garrison is an EV charging site in Northallerton, North Yorkshire, run by InstaVolt Ltd. It has a single socket, with CCS at up to 85 kW, and the price is listed as £0.85/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Superstore - Catterick Garrison, 130 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Price
- £0.85/kWh(from Open Charge Map, 8 Apr 2026)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at McDonald's Catterick - Garrison (InstaVolt Ltd)?
Up to 85 kW DC via CCS, CHAdeMO.
How many charging sockets does McDonald's Catterick - Garrison (InstaVolt Ltd) have?
1 charging socket: 1 × 85 kW CCS, 1 × 50 kW CHAdeMO.
Who operates McDonald's Catterick - Garrison?
McDonald's Catterick - Garrison is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to McDonald's Catterick - Garrison (InstaVolt Ltd)?
Pod Point Tesco Superstore - Catterick Garrison is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 41 min on the 85 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 32 min on the 85 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McDonald's Catterick - Garrison (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 46 min on the 85 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point RazorBlue · 24p per kWh · 7 kW · 1.3 mi
- Fastest nearby
- Jet Charge · 150 kW · 1.8 mi