Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Jet Charge

Catterick Road, Northallerton, DL9 4RZ

Jet Charge is an EV charging site in Northallerton, North Yorkshire. Its 3 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.65/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonald's Catterick - Garrison (InstaVolt Ltd), 1.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 25 Apr 2023Last verified 25 Apr 2023

Connectors

CCS · 150 kW4 connectors
CHAdeMO · 100 kW2 connectors

Site information

Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
£0.65/kWh(from Open Charge Map, 25 Apr 2023)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Jet Charge?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Jet Charge?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Jet Charge have?

3 charging sockets: 4 × 150 kW CCS, 2 × 100 kW CHAdeMO.

Where is the nearest other charger with 50 kW or more to Jet Charge?

McDonald's Catterick - Garrison (InstaVolt Ltd) is 1.8 miles away in a straight line, with up to 85 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Jet Charge?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jet Charge?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Jet Charge?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 25 Apr 2023

Amp Map does not take payment. You pay the operator.