InstaVolt Ltd · EV charging site
Starbucks Wyberton
The Quadrant, Boston, PE21 7NH
Starbucks Wyberton is an EV charging site in Boston, Lincolnshire, run by InstaVolt Ltd. All 4 of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Co-op Skirbeck Road (BP Pulse), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Notes
- Chargers accessible 24/7. Starbucks open 07:00-19:00 Mon-Fri & 08:00-19:00 Sat-Sun. Opposite are Costa (05:30-21:00), Greggs (06:30-17:30) and Burger King.
- Getting there
- 4 Instavolt DC rapid chargers
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Starbucks Wyberton (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Starbucks Wyberton (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Starbucks Wyberton (InstaVolt Ltd) have?
4 charging sockets: 4 × 50 kW CCS, 4 × 50 kW CHAdeMO.
Who operates Starbucks Wyberton?
Starbucks Wyberton is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Starbucks Wyberton (InstaVolt Ltd)?
Co-op Skirbeck Road (BP Pulse) is 1.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Starbucks Wyberton (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Wyberton (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Starbucks Wyberton (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Co-op Skirbeck Road
- Lincolnshire Co-op Woodville Road Food Store
- Staniland
- Staniland Car Park
- Chalky Car Park
- West End
- Cheapest nearby
- Lincolnshire Co-op Woodville Road Food Store · 89p per kWh · 50 kW · 1.3 mi