Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

IONITY · EV charging site

IONITY GmbH IONITY Dartford M25

Masthead Close 1, Dartford, DA2 6QF

IONITY GmbH IONITY Dartford M25 is an EV charging site in Dartford, Kent, run by IONITY and open 24 hours a day. Its 20 sockets reach up to 400 kW, with CCS at the top speed, and the published price is £0.83 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 89% uptime and recorded 1200 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Dartford, UK - Tesla Centre, 50 yards away.

Status

18 of 20 available

Checking status…

VerifiedLive status and details from Ionity’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 400 kW8 connectors · 83.3p per kWh7 free1 in use
7191% reliabilityAvailable
7291% reliabilityAvailable
7391% reliabilityAvailable
7491% reliabilityCharging
75100% reliabilityAvailable
76100% reliabilityAvailable
7791% reliabilityAvailable
7891% reliabilityAvailable
CCS · 350 kW12 connectors · 83.3p per kWh11 free1 in use
0193% reliabilityAvailable
0293% reliabilityAvailable
0393% reliabilityAvailable
04100% reliabilityAvailable
05100% reliabilityAvailable
06100% reliabilityAvailable
07100% reliabilityAvailable
0877% reliabilityBlocked

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
IONITY
Opening hours
Open 24 hours
Payment
In the IONITY appRFID card
Charger ID
01
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW83.3p per kWh
CCS350 kW83.3p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£33
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£42
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£34

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at IONITY GmbH IONITY Dartford M25?

The listed price is £0.83/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at IONITY GmbH IONITY Dartford M25?

Up to 400 kW DC via CCS.

How many charging sockets does IONITY GmbH IONITY Dartford M25 have?

20 charging sockets: 12 × 350 kW CCS, 8 × 400 kW CCS. Live per-socket availability is shown on this page.

Is IONITY GmbH IONITY Dartford M25 open 24/7?

Yes - IONITY GmbH IONITY Dartford M25 is open 24 hours a day, 7 days a week.

When is IONITY GmbH IONITY Dartford M25 busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IONITY GmbH IONITY Dartford M25?

Amp Map measured 89% uptime here from recorded live status over the last 30 days, across 1200 observed charging sessions.

Who operates IONITY GmbH IONITY Dartford M25?

IONITY GmbH IONITY Dartford M25 is on the IONITY network.

Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Dartford M25?

Dartford, UK - Tesla Centre is 50 yards away in a straight line, with up to 250 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Dartford M25?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Dartford M25?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Dartford M25?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Ionity · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.