MER · EV charging site
Burnell Switchgear and Controls
Capstan Court, Dartford, DA2 6QG
Burnell Switchgear and Controls is an EV charging site in Dartford, Kent, run by MER. All 4 of its sockets are 22 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is IONITY GmbH IONITY Dartford M25, 140 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Customers only
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Burnell Switchgear and Controls (MER)?
Up to 22 kW AC via Type 2.
How many charging sockets does Burnell Switchgear and Controls (MER) have?
4 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Burnell Switchgear and Controls?
Burnell Switchgear and Controls is on the MER network.
Can anyone charge at Burnell Switchgear and Controls (MER)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Burnell Switchgear and Controls (MER)?
IONITY GmbH IONITY Dartford M25 is 140 yards away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Burnell Switchgear and Controls (MER)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Burnell Switchgear and Controls (MER)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Burnell Switchgear and Controls (MER)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- IONITY GmbH IONITY Dartford M25
- Dartford, UK - Tesla Centre
- The Wharf, Dartford
- Motorline Nissan Dartford
- Bull (Horns Cross)
- Stone Pavillion
- Cheapest nearby
- Dartford, UK - Tesla Centre · 55p per kWh · 250 kW · 140 yd
- Fastest nearby
- IONITY GmbH IONITY Dartford M25 · 400 kW · 140 yd