Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

IONITY · EV charging site

IONITY GmbH IONITY Swindon VH

Shaw Ridge Leisure Park, Whitehill Way, Swindon, SN5 7DW

IONITY GmbH IONITY Swindon VH is an EV charging site in Swindon, Borough of Swindon, run by IONITY and open 24 hours a day. Its 6 sockets reach up to 200 kW, with CCS at the top speed, and published prices run from £0.62 to £0.83 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 99% uptime and recorded 883 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Basepoint Swindon (Be.EV), 0.8 miles away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from Ionity’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 200 kW4 connectors · 83.3p per kWh3 free1 in use
71100% reliabilityCharging
7299% reliabilityAvailable
73100% reliabilityAvailable
74100% reliabilityAvailable
CCS · 50 kW2 connectors · 62.3p per kWh1 free1 in use
5197% reliabilityCharging
5298% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
IONITY
Opening hours
Open 24 hours
Payment
In the IONITY appRFID card
Charger ID
51
Energy
100% renewable energy

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS200 kW83.3p per kWh
CCS50 kW62.3p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£33
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£42
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£34

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at IONITY GmbH IONITY Swindon VH?

The listed price is CCS £0.83/kWh · CCS £0.62/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at IONITY GmbH IONITY Swindon VH?

Up to 200 kW DC via CCS.

How many charging sockets does IONITY GmbH IONITY Swindon VH have?

6 charging sockets: 4 × 200 kW CCS, 2 × 50 kW CCS. Live per-socket availability is shown on this page.

Is IONITY GmbH IONITY Swindon VH open 24/7?

Yes - IONITY GmbH IONITY Swindon VH is open 24 hours a day, 7 days a week.

When is IONITY GmbH IONITY Swindon VH busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is IONITY GmbH IONITY Swindon VH?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 883 observed charging sessions.

Who operates IONITY GmbH IONITY Swindon VH?

IONITY GmbH IONITY Swindon VH is on the IONITY network.

Where is the nearest other charger with 50 kW or more to IONITY GmbH IONITY Swindon VH?

Basepoint Swindon (Be.EV) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at IONITY GmbH IONITY Swindon VH?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at IONITY GmbH IONITY Swindon VH?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at IONITY GmbH IONITY Swindon VH?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Ionity · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.