RWE / Npower · EV charging site
Charging Station npower
Windmill Hill Business Park, Swindon, SN5 6PB
Charging Station npower is an EV charging site in Swindon, Borough of Swindon, run by RWE / Npower. It has a single 22 kW Type 2 socket, and the price is listed as Charges May Apply. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Porsche Centre Swindon (Porsche Smart Mobility GmbH), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- RWE / Npower
- Opening hours
- Not published
- Access
- Private · membership required
- Price
- Charges May Apply(from Open Charge Map, 6 Mar 2020)
- Getting there
- Gated business park, gates closed at weekends.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Charging Station npower (RWE / Npower)?
The listed price is Charges May Apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Charging Station npower (RWE / Npower)?
Up to 22 kW AC via Type 2.
How many charging sockets does Charging Station npower (RWE / Npower) have?
1 charging socket: 2 × 22 kW Type 2.
Who operates Charging Station npower?
Charging Station npower is on the RWE / Npower network.
Can anyone charge at Charging Station npower (RWE / Npower)?
The operator lists this charger as private - access is restricted.
Where is the nearest charger with 50 kW or more to Charging Station npower (RWE / Npower)?
Porsche Centre Swindon (Porsche Smart Mobility GmbH) is 0.3 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Charging Station npower (RWE / Npower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Charging Station npower (RWE / Npower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Charging Station npower (RWE / Npower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ids Swindon
- Porsche Centre Swindon
- National Self-Build and Renovation Centre
- Instavolt Lydiard Fields
- IONITY GmbH IONITY Swindon VH
- Mannington Retail Park
- Cheapest nearby
- Mannington Retail Park · 59p per kWh · 150 kW · 1.4 mi
- Fastest nearby
- Porsche Centre Swindon · 350 kW · 0.3 mi