Joju Ltd · EV charging site
Cranborne High Street
High Street, Ferndown, BH21 65P
Cranborne High Street is an EV charging site in Ferndown, Dorset, run by Joju Ltd. Both of its sockets are 22 kW Type 2, and the price is listed as £0.55 / kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Potter's Wheel Car Park (Be.EV), 3.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Price
- £0.55 / kWh(from Open Charge Map, 3 Apr 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cranborne High Street (Joju Ltd)?
The listed price is £0.55 / kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Cranborne High Street (Joju Ltd)?
Up to 22 kW AC via Type 2.
How many charging sockets does Cranborne High Street (Joju Ltd) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Cranborne High Street?
Cranborne High Street is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to Cranborne High Street (Joju Ltd)?
Potter's Wheel Car Park (Be.EV) is 3.3 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cranborne High Street (Joju Ltd)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cranborne High Street (Joju Ltd)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cranborne High Street (Joju Ltd)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- The Hub Car Park · 59p per kWh · 22 kW · 3.2 mi
- Fastest nearby
- LEAP24 Charging Station · 120 kW · 3.7 mi