Lidl · EV charging site
Lidl Verwood
Ringwood Road, Ferndown, BH31 7AJ
Lidl Verwood is an EV charging site in Ferndown, Dorset, run by Lidl. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is LEAP24 Charging Station (Leap24 (NL)), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public
- Price
- £0.74/kWh; other tariffs available(from Open Charge Map, 24 Sept 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl Verwood?
The listed price is £0.74/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl Verwood?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lidl Verwood have?
1 charging socket: 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Lidl Verwood?
Lidl Verwood is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl Verwood?
LEAP24 Charging Station (Leap24 (NL)) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl Verwood?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl Verwood?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl Verwood?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- LEAP24 Charging Station
- Potter's Wheel Car Park
- The Hub Car Park
- Pod Point Lewis Concrete Ltd
- Cranborne High Street
- Furlong Car Park 1
- Cheapest nearby
- The Hub Car Park · 59p per kWh · 22 kW · 0.7 mi
- Fastest nearby
- LEAP24 Charging Station · 120 kW · 0.4 mi