Joju Ltd · EV charging site
Cranbury Road - Bollard Adjacent To Lighting Column 14
94-96 Cranbury Road, Eastleigh, SO50 5HD
Cranbury Road - Bollard Adjacent To Lighting Column 14 is an EV charging site in Eastleigh, Hampshire, run by Joju Ltd. It has a single 4 kW Type 2 socket. 32 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Romsey Road Car Park (Be.EV), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Joju Ltd
- Opening hours
- Not published
- Access
- Public
- Getting there
- Bollard between the houses number 94 and 96
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Cranbury Road - Bollard Adjacent To Lighting Column 14 (Joju Ltd)?
Up to 4 kW AC via Type 2.
How many charging sockets does Cranbury Road - Bollard Adjacent To Lighting Column 14 (Joju Ltd) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Cranbury Road - Bollard Adjacent To Lighting Column 14?
Cranbury Road - Bollard Adjacent To Lighting Column 14 is on the Joju Ltd network.
Where is the nearest charger with 50 kW or more to Cranbury Road - Bollard Adjacent To Lighting Column 14 (Joju Ltd)?
Romsey Road Car Park (Be.EV) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cranbury Road - Bollard Adjacent To Lighting Column 14 (Joju Ltd)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cranbury Road - Bollard Adjacent To Lighting Column 14 (Joju Ltd)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cranbury Road - Bollard Adjacent To Lighting Column 14 (Joju Ltd)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Factory Road Lamppost Charger
- Desborough Road - Bollard Adjacent To Lighting Column 17
- Factory Road - Lighting Column 14
- Nutbeem Road - Bollard Adjacent To Lighting Column 14
- Cranbury Road - Bollard Adjacent To Lighting Column 6
- Cranbury Road - Bollard Adjacent To Lighting Column 22
- Fastest nearby
- Factory Road Lamppost Charger · 5 kW · 100 yd