Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Joju Ltd · EV charging site

Factory Road Lamppost Charger

Factory Road, Eastleigh, SO50 5HB

Factory Road Lamppost Charger is an EV charging site in Eastleigh, Hampshire, run by Joju Ltd. It has a single 5 kW Type 2 socket. 32 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Romsey Road Car Park (Be.EV), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Jul 2022Last verified 16 Jul 2022

Connectors

Type 2 · 5 kW1 connector

Site information

Operator
Joju Ltd
Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Factory Road Lamppost Charger (Joju Ltd)?

Up to 5 kW AC via Type 2.

How many charging sockets does Factory Road Lamppost Charger (Joju Ltd) have?

1 charging socket: 1 × 5 kW Type 2.

Who operates Factory Road Lamppost Charger?

Factory Road Lamppost Charger is on the Joju Ltd network.

Where is the nearest charger with 50 kW or more to Factory Road Lamppost Charger (Joju Ltd)?

Romsey Road Car Park (Be.EV) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Factory Road Lamppost Charger (Joju Ltd)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Factory Road Lamppost Charger (Joju Ltd)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Factory Road Lamppost Charger (Joju Ltd)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Jul 2022

Amp Map does not take payment. You pay the operator.