LiFe (Raw Charging) · EV charging site
Seacombe Ferry Terminal
Victoria Place, Birkenhead, CH44 6QY
Seacombe Ferry Terminal is an EV charging site in Birkenhead, Metropolitan Borough of Wirral, run by LiFe (Raw Charging). All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.30/kWh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Animal Trust Birkenhead (Be.EV), 1.2 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- LiFe (Raw Charging)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.30/kWh(from Open Charge Map, 2 Oct 2022)
- Getting there
- Charge points are available to all members of the general public. There are no restrictions on length of stay & no parking fees apply.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Seacombe Ferry Terminal (LiFe (Raw Charging))?
Up to 7 kW AC via Type 2.
How many charging sockets does Seacombe Ferry Terminal (LiFe (Raw Charging)) have?
4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Seacombe Ferry Terminal?
Seacombe Ferry Terminal is on the LiFe (Raw Charging) network.
Where is the nearest charger with 50 kW or more to Seacombe Ferry Terminal (LiFe (Raw Charging))?
Animal Trust Birkenhead (Be.EV) is 1.2 miles away in a straight line, with up to 51 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Seacombe Ferry Terminal (LiFe (Raw Charging))?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Princess Dock MSCP
- Princes Dock (Liverpool)
- Elgin Way Car Park
- Elgin Way
- o/s house 3 The Summit, Wallasey
- Titanic Hotel
- Cheapest nearby
- Princes Dock (Liverpool) · 65p per kWh · 22 kW · 0.8 mi
- Fastest nearby
- Princess Dock MSCP · 22 kW · 0.8 mi