EV charging site
ME20 6AH
Maidstone, ME20 6AH
ME20 6AH is an EV charging site in Maidstone, Kent. Both of its sockets are 7 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Maidstone (GeniePoint), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at ME20 6AH?
Up to 7 kW AC via Type 2.
How many charging sockets does ME20 6AH have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to ME20 6AH?
Morrisons Maidstone (GeniePoint) is 0.7 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ME20 6AH?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ME20 6AH?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ME20 6AH?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Beadles Aylesford
- Morrisons Maidstone
- Pod Point South Aylesford Retail Park
- Pod Point Tesco Extra - Aylesford Lunsford Park
- Bailey Bridge East 1
- Fields at Aylesford, Maidstone
- Cheapest nearby
- Pod Point South Aylesford Retail Park · 44.4p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Fields at Aylesford, Maidstone · 200 kW · 1.5 mi