GeniePoint · EV charging site
Morrisons Maidstone
Larkfield, Maidstone, ME20 6PW
Morrisons Maidstone is an EV charging site in Maidstone, Kent, run by GeniePoint. Its 3 sockets reach up to 60 kW, with Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Aylesford Lunsford Park, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Morrisons Maidstone (GeniePoint)?
Up to 60 kW DC via Type 2, CHAdeMO.
How many charging sockets does Morrisons Maidstone (GeniePoint) have?
3 charging sockets: 1 × 60 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Morrisons Maidstone?
Morrisons Maidstone is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Morrisons Maidstone (GeniePoint)?
Pod Point Tesco Extra - Aylesford Lunsford Park is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morrisons Maidstone (GeniePoint)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morrisons Maidstone (GeniePoint)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morrisons Maidstone (GeniePoint)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ME20 6AH
- Pod Point Tesco Extra - Aylesford Lunsford Park
- Beadles Aylesford
- Pod Point South Aylesford Retail Park
- Bailey Bridge East 1
- Fields at Aylesford, Maidstone
- Cheapest nearby
- Pod Point Tesco Extra - Aylesford Lunsford Park · 44.4p per kWh · 50 kW · 0.8 mi
- Fastest nearby
- Fields at Aylesford, Maidstone · 200 kW · 2.1 mi