Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

BMO Watchmoor Park

Watchmoor Park, Camberley, GU15 3YL

BMO Watchmoor Park is an EV charging site in Camberley, Surrey, run by Be.EV and open 24 hours a day. All 6 of its sockets are 22 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 43 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Watchmoor Park Riverside (InstaVolt Ltd), 130 yards away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW6 connectors · 59p per kWh6 free
AD00082-1100% reliabilityAvailable
AD00082-2100% reliabilityAvailable
AD00083-1100% reliabilityAvailable
AD00083-2100% reliabilityAvailable
AD00084-1100% reliabilityAvailable
AD00084-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00082-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at BMO Watchmoor Park (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at BMO Watchmoor Park (Be.EV)?

Up to 22 kW AC via Type 2.

How many charging sockets does BMO Watchmoor Park (Be.EV) have?

6 charging sockets: 6 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is BMO Watchmoor Park (Be.EV) open 24/7?

Yes - BMO Watchmoor Park (Be.EV) is open 24 hours a day, 7 days a week.

When is BMO Watchmoor Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is BMO Watchmoor Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 43 observed charging sessions.

Who operates BMO Watchmoor Park?

BMO Watchmoor Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to BMO Watchmoor Park (Be.EV)?

Watchmoor Park Riverside (InstaVolt Ltd) is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at BMO Watchmoor Park (Be.EV)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BMO Watchmoor Park (Be.EV)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at BMO Watchmoor Park (Be.EV)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.