MER · EV charging site
Civic Centre Surface Car Park
Municipal Road, Poole, BH15 2RU
Civic Centre Surface Car Park is an EV charging site in Poole, Bournemouth, Christchurch and Poole Council, run by MER. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.78/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Municipal Road (Joju Ltd), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.78/kWh(from Open Charge Map, 22 Feb 2024)
- Notes
- The UK's first Solar PV Powered Rapid Charger
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Civic Centre Surface Car Park (MER)?
The listed price is £0.78/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Civic Centre Surface Car Park (MER)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Civic Centre Surface Car Park (MER) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Civic Centre Surface Car Park?
Civic Centre Surface Car Park is on the MER network.
Where is the nearest other charger with 50 kW or more to Civic Centre Surface Car Park (MER)?
Municipal Road (Joju Ltd) is 100 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Civic Centre Surface Car Park (MER)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Civic Centre Surface Car Park (MER)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Civic Centre Surface Car Park (MER)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Municipal Road
- Swimming Pool Car Park
- Seldown Lane
- Serpentine Lane & Serpentine Lane Disabled
- Serpentine Lane
- Shell Recharge EV Waitrose - Parkstone
- Cheapest nearby
- Swimming Pool Car Park · 59p per kWh · 22 kW · 0.7 mi
- Fastest nearby
- Shell Recharge EV Waitrose - Parkstone · 120 kW · 1 mi