Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

South Railway Street

South Railway Street, Seaham, SR7 7ES

South Railway Street is an EV charging site in Seaham, County Durham, run by Be.EV and open 24 hours a day. Both of its sockets are 22 kW Type 2, and the published price is £0.59 per kWh. Amp Map measured 100% uptime here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Green Street Car Park (Be.EV), 130 yards away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD00877-1100% reliabilityAvailable
AD00877-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00877-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at South Railway Street (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at South Railway Street (Be.EV)?

Up to 22 kW AC via Type 2.

How many charging sockets does South Railway Street (Be.EV) have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is South Railway Street (Be.EV) open 24/7?

Yes - South Railway Street (Be.EV) is open 24 hours a day, 7 days a week.

How reliable is South Railway Street (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

Who operates South Railway Street?

South Railway Street is on the Be.EV network.

Where is the nearest charger with 50 kW or more to South Railway Street (Be.EV)?

Green Street Car Park (Be.EV) is 130 yards away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at South Railway Street (Be.EV)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Railway Street (Be.EV)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at South Railway Street (Be.EV)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.