MER · EV charging site
Green Street Car Park
Interchange, Seaham, SR7 7HD
Green Street Car Park is an EV charging site at Interchange in Seaham, County Durham, run by MER. It has a single 7 kW Type 2 socket, and the price is listed as £0.35/kWh. Amp Map lists 1 other charge point named Green Street Car Park in Seaham. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Green Street Car Park (Be.EV), 80 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MER
- Opening hours
- Not published
- Access
- Public
- Price
- £0.35/kWh(from Open Charge Map, 29 Aug 2022)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Green Street Car Park (MER)?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Green Street Car Park (MER)?
Up to 7 kW AC via Type 2.
How many charging sockets does Green Street Car Park (MER) have?
1 charging socket: 2 × 7 kW Type 2.
Who operates Green Street Car Park?
Green Street Car Park is on the MER network.
Where is the nearest charger with 50 kW or more to Green Street Car Park (MER)?
Green Street Car Park (Be.EV) is 80 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Green Street Car Park (MER)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Green Street Car Park (MER)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Green Street Car Park (MER)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Green Street Car Park
- South Railway Street
- St. John's Car Park
- Terrace Green Car Park
- North Terrace Car Park
- Spectrum 8
- Cheapest nearby
- South Railway Street · 59p per kWh · 22 kW · 0.1 mi
- Fastest nearby
- Green Street Car Park · 75 kW · 80 yd