MFG EV Power · EV charging site
MFG Merry Hill
The Waterfront, Brierley Hill, DY5 1SY
MFG Merry Hill is an EV charging site in Brierley Hill, Dudley, run by MFG EV Power. Its 7 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.79/kWh. 14 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Port West Waterfront West (BP Pulse), 130 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.79/kWh(from Open Charge Map, 3 Apr 2023)
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Merry Hill (MFG EV Power)?
The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Merry Hill (MFG EV Power)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does MFG Merry Hill (MFG EV Power) have?
7 charging sockets: 7 × 150 kW CCS, 7 × 50 kW CHAdeMO.
Who operates MFG Merry Hill?
MFG Merry Hill is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to MFG Merry Hill (MFG EV Power)?
Port West Waterfront West (BP Pulse) is 130 yards away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Merry Hill (MFG EV Power)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Merry Hill (MFG EV Power)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Merry Hill (MFG EV Power)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Port West Waterfront West
- Oak Park
- Brierly Hill Dudley
- Level Street, Brierly Hill - Public Car Park
- Merry Hill, UK
- zest-gold-type-plan
- Cheapest nearby
- Merry Hill, UK · 40p per kWh · 250 kW · 0.4 mi
- Fastest nearby
- Port West Waterfront West · 300 kW · 130 yd