Charge Your Car · EV charging site
Brierly Hill Dudley
Brierly Hill Dudley, Brierley Hill, DY5 1UA
Brierly Hill Dudley is an EV charging site in Brierley Hill, Dudley, run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Level Street, Brierly Hill - Public Car Park (Charge Your Car), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Brierly Hill Dudley (Charge Your Car)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Brierly Hill Dudley (Charge Your Car) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Brierly Hill Dudley?
Brierly Hill Dudley is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Brierly Hill Dudley (Charge Your Car)?
Level Street, Brierly Hill - Public Car Park (Charge Your Car) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brierly Hill Dudley (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brierly Hill Dudley (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brierly Hill Dudley (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Level Street, Brierly Hill - Public Car Park
- The Moor Centre
- MFG Merry Hill
- Merry Hill, UK
- Port West Waterfront West
- zest-gold-type-plan
- Cheapest nearby
- Merry Hill, UK · 33p per kWh · 250 kW · 0.3 mi
- Fastest nearby
- Port West Waterfront West · 300 kW · 0.3 mi