Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

POGO · EV charging site

The Moor Centre

5 Bell Street, Brierley Hill, DY5 3AH

The Moor Centre is an EV charging site in Brierley Hill, Dudley, run by POGO. All 4 of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 35 charging sessions here over the last 30 days. 14 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Brierly Hill Dudley (Charge Your Car), 0.3 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from POGO’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 200 kW4 connectors · 65p per kWh4 free
PoGo20126100% reliabilityAvailable
PoGo20126100% reliabilityAvailable
PoGo20127100% reliabilityAvailable
PoGo20127100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
POGO
Opening hours
Not published
Payment
In the PoGo Charge appRFID card
Charger ID
PoGo20126

Always check directly with the charge point operator for the most up-to-date information.

Prices

65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Moor Centre (POGO)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at The Moor Centre (POGO)?

Up to 200 kW DC via CCS.

How many charging sockets does The Moor Centre (POGO) have?

4 charging sockets: 4 × 200 kW CCS. Live per-socket availability is shown on this page.

When is The Moor Centre (POGO) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is The Moor Centre (POGO)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 35 observed charging sessions.

Who operates The Moor Centre?

The Moor Centre is on the POGO network.

Where is the nearest other charger with 50 kW or more to The Moor Centre (POGO)?

Brierly Hill Dudley (Charge Your Car) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Moor Centre (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Moor Centre (POGO)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Moor Centre (POGO)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: POGO · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.