Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Monta · EV charging site

Crown Hotel Wetheral

Station Road, Carlisle, CA4 8ES

Crown Hotel Wetheral is an EV charging site in Carlisle, Cumbria, run by Monta. Its 2 sockets reach up to 50 kW, with CCS at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Crown Hotel Accounts, 90 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Apr 2026Last verified 5 Apr 2026

Connectors

CCS · 50 kW2 connectors
Type 2 · 22 kW4 connectors

Site information

Operator
Monta
Opening hours
Not published
Access
Public
Phone (from Open Charge Map)
01228 561888

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Crown Hotel Wetheral (Monta)?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Crown Hotel Wetheral (Monta) have?

2 charging sockets: 4 × 22 kW Type 2, 2 × 50 kW CCS.

Who operates Crown Hotel Wetheral?

Crown Hotel Wetheral is on the Monta network. For site issues, the operator lists 01228 561888.

Where is the nearest other charger with 50 kW or more to Crown Hotel Wetheral (Monta)?

Crown Hotel Accounts is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Crown Hotel Wetheral (Monta)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Crown Hotel Wetheral (Monta)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Crown Hotel Wetheral (Monta)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 5 Apr 2026

Amp Map does not take payment. You pay the operator.