Nissan UK Dealer Network · EV charging site
Bolton Street
Bolton Street, Bury, BL9 0HY
Bolton Street is an EV charging site in Bury, Borough of Bury, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Mill Gate Shopping Centre (Be.EV), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 15 Aug 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bolton Street (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Bolton Street (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Bolton Street (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Bolton Street?
Bolton Street is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to Bolton Street (Nissan UK Dealer Network)?
Mill Gate Shopping Centre (Be.EV) is 0.5 miles away in a straight line, with up to 51 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bolton Street (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bolton Street (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bolton Street (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Castle
- The Castle Car Park
- Bury Market
- Parson Lane North
- Mill Gate Shopping Centre
- Trinity Bridge House
- Cheapest nearby
- The Castle Car Park · 59p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Mill Gate Shopping Centre · 51 kW · 0.5 mi