Nissan UK Dealer Network · EV charging site
Renault Nissan Alliance office
5 Wolsey Business Park, Tolpits Lane, Watford, WD18 9BL
Renault Nissan Alliance office is an EV charging site in Watford, Hertfordshire, run by Nissan UK Dealer Network. Its 2 sockets reach up to 50 kW, with CHAdeMO at the top speed. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Watford (GeniePoint), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Customers only
- Notes
- DBT spotted in Renault-Nissan car park. No network branding. no RFID (push-button start/stop) but connector is padlocked
- Getting there
- workplace charging.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Renault Nissan Alliance office (Nissan UK Dealer Network)?
Up to 50 kW DC via CHAdeMO, Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Renault Nissan Alliance office (Nissan UK Dealer Network) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Renault Nissan Alliance office?
Renault Nissan Alliance office is on the Nissan UK Dealer Network network.
Can anyone charge at Renault Nissan Alliance office (Nissan UK Dealer Network)?
The operator lists this charger for customers of the site.
Where is the nearest other charger with 50 kW or more to Renault Nissan Alliance office (Nissan UK Dealer Network)?
Morrisons Watford (GeniePoint) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Renault Nissan Alliance office (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Renault Nissan Alliance office (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Renault Nissan Alliance office (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Caxton Way Entrance, Watford
- Caxton Way Exit, Watford
- Pod Point Chime Housing - Dapple Court
- Croxley Business Park Building 1
- Watford Business Park
- Morrisons Watford
- Cheapest nearby
- Pod Point Chime Housing - Dapple Court · 57.6p per kWh · 7 kW · 0.3 mi