EV charging site
Watford Business Park
Greenhill Crescent, Watford, WD18 8QU
Watford Business Park is an EV charging site in Watford, Hertfordshire. Both of its sockets are 7 kW Type 2. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Watford (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Watford Business Park?
Up to 7 kW AC via Type 2.
How many charging sockets does Watford Business Park have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to Watford Business Park?
Morrisons Watford (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Watford Business Park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Watford Business Park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Watford Business Park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Croxley Business Park Building 1
- Caxton Way Exit, Watford
- Morrisons Watford
- Pod Point Chime Housing - Dapple Court
- Caxton Way Entrance, Watford
- Renault Nissan Alliance office
- Cheapest nearby
- Pod Point Chime Housing - Dapple Court · 57.6p per kWh · 7 kW · 0.2 mi
- Fastest nearby
- Morrisons Watford · 50 kW · 0.2 mi