EV charging site
Nottingham Trent University
Brackenhurst Campus, Newark on Trent, NG25 0QF
Nottingham Trent University is an EV charging site in Newark on Trent, Nottinghamshire. It has a single 7 kW Type 2 socket, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Southwell Green SF Connect (BP Pulse), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 8 Oct 2016)
- Notes
- Elektromotive charge point
- Getting there
- Access for visitors and staff. Behind barrier
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nottingham Trent University?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Nottingham Trent University?
Up to 7 kW AC via Type 2.
How many charging sockets does Nottingham Trent University have?
1 charging socket: 1 × 7 kW Type 2.
Can anyone charge at Nottingham Trent University?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Nottingham Trent University?
Southwell Green SF Connect (BP Pulse) is 1.4 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nottingham Trent University?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham Trent University?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nottingham Trent University?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Saracens Head Hotel & Restaurant
- The Bramley Centre Car Park Kings Court
- Southwell Green SF Connect
- The Spread Eagle
- Cheapest nearby
- The Bramley Centre Car Park Kings Court · 65p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Southwell Green SF Connect · 300 kW · 1.4 mi