Roam Charging · EV charging site
The Saracens Head Hotel & Restaurant
Market Place, Newark on Trent, NG25 0HE
The Saracens Head Hotel & Restaurant is an EV charging site in Newark on Trent, Nottinghamshire, run by Roam Charging. All 4 of its sockets are 22 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Southwell Green SF Connect (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Roam Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0330 111 2999
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Saracens Head Hotel & Restaurant (Roam Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Saracens Head Hotel & Restaurant (Roam Charging) have?
4 charging sockets: 4 × 22 kW Type 2.
Who operates The Saracens Head Hotel & Restaurant?
The Saracens Head Hotel & Restaurant is on the Roam Charging network. For site issues, the operator lists 0330 111 2999.
Where is the nearest charger with 50 kW or more to The Saracens Head Hotel & Restaurant (Roam Charging)?
Southwell Green SF Connect (BP Pulse) is 0.6 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Saracens Head Hotel & Restaurant (Roam Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Saracens Head Hotel & Restaurant (Roam Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Saracens Head Hotel & Restaurant (Roam Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Bramley Centre Car Park Kings Court
- Southwell Green SF Connect
- Nottingham Trent University
- The Spread Eagle
- Cheapest nearby
- The Bramley Centre Car Park Kings Court · 65p per kWh · 7 kW · 150 yd
- Fastest nearby
- Southwell Green SF Connect · 300 kW · 0.6 mi