Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Shell, Radcliffe

207 Bury and Bolton Road, Radcliffe, M26 4JY

Shell, Radcliffe is an EV charging site in Radcliffe, Borough of Bury, run by Osprey Charging and open 24 hours a day. Its 4 sockets reach up to 75 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 93% uptime and recorded 570 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Wellington (Bury) (evyve), 0.7 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors · 89p per kWh2 free
#298% reliabilityAvailable
#495% reliabilityAvailable
CHAdeMO · 50 kW2 connectors · 89p per kWh2 free
#195% reliabilityAvailable
#382% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Getting there
No Parking Restrictions No Height Restriction No Customer Input Required

Facilities

Supermarket

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW89p per kWh
CHAdeMO50 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shell, Radcliffe (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shell, Radcliffe (Osprey Charging)?

Up to 75 kW DC via CCS, CHAdeMO.

How many charging sockets does Shell, Radcliffe (Osprey Charging) have?

4 charging sockets: 2 × 75 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Shell, Radcliffe (Osprey Charging) open 24/7?

Yes - Shell, Radcliffe (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Shell, Radcliffe (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Shell, Radcliffe (Osprey Charging)?

Amp Map measured 93% uptime here from recorded live status over the last 30 days, across 570 observed charging sessions.

Who operates Shell, Radcliffe?

Shell, Radcliffe is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Shell, Radcliffe (Osprey Charging)?

Wellington (Bury) (evyve) is 0.7 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shell, Radcliffe (Osprey Charging)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell, Radcliffe (Osprey Charging)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell, Radcliffe (Osprey Charging)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.