Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Starbucks, Boston

Swineshead Road, Boston, PE21 7JE

Starbucks, Boston is an EV charging site in Boston, Lincolnshire, run by Osprey Charging and open 24 hours a day. Its 4 sockets reach up to 75 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 96% uptime and recorded 178 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Chain Bridge, Boston (Osprey Charging), 100 yards away.

Status

All 4 in use

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors · 89p per kWh2 in use
#2100% reliabilityCharging
#499% reliabilityCharging
CHAdeMO · 50 kW2 connectors · 89p per kWh2 in use
#199% reliabilityCharging
#384% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Getting there
No Parking Restrictions No Height Restriction No Customer Input Required

Facilities

RestaurantCafé

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW89p per kWh
CHAdeMO50 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Starbucks, Boston (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Starbucks, Boston (Osprey Charging)?

Up to 75 kW DC via CCS, CHAdeMO.

How many charging sockets does Starbucks, Boston (Osprey Charging) have?

4 charging sockets: 2 × 75 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Starbucks, Boston (Osprey Charging) open 24/7?

Yes - Starbucks, Boston (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Starbucks, Boston (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Starbucks, Boston (Osprey Charging)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 178 observed charging sessions.

Who operates Starbucks, Boston?

Starbucks, Boston is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Starbucks, Boston (Osprey Charging)?

Chain Bridge, Boston (Osprey Charging) is 100 yards away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbucks, Boston (Osprey Charging)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks, Boston (Osprey Charging)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbucks, Boston (Osprey Charging)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.