Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Peugeot Motor Co Ltd

Pinley House, Coventry, CV3 1ND

Peugeot Motor Co Ltd is an EV charging site in Coventry. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 73 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy), 0.6 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 20 Sept 2013Last verified 20 Sept 2013

Connectors

Type 2 · 7 kW1 connector
BS1363 3 Pin 13 Amp · 3 kW1 connector

Site information

Opening hours
Not published
Phone (from Open Charge Map)
024 7688 4000
Notes
Fitted under Midlands PiP
Getting there
One charging point, two sockets, RFID card accessed

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Peugeot Motor Co Ltd?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

How many charging sockets does Peugeot Motor Co Ltd have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

Where is the nearest charger with 50 kW or more to Peugeot Motor Co Ltd?

26 Stoke Green (Opp. Tick-tock Park) (ESB Energy) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Peugeot Motor Co Ltd?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Peugeot Motor Co Ltd?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Peugeot Motor Co Ltd?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 20 Sept 2013

Amp Map does not take payment. You pay the operator.