Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Aldi - Weymouth

Mercery Road, Weymouth, DT3 5FA

Pod Point Aldi - Weymouth is an EV charging site in Weymouth, Dorset, run by Pod Point. All 8 of its sockets are 22 kW Type 2, and the published price is £0.25 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 62% uptime and recorded 214 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Famous Old Spa, Weymouth (Osprey Charging), 0.1 miles away.

Status

4 of 8 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 22 kW8 connectors · 25.2p per kWh4 free1 in use3 out of service
Isla-Frey0% reliabilityOut of order
Isla-Frey0% reliabilityAvailable
Jill-Alec0% reliabilityOut of order
Jill-Alec0% reliabilityAvailable
Owen-Zena0% reliabilityOut of order
Owen-Zena0% reliabilityAvailable
Ross-Iggy100% reliabilityCharging
Ross-Iggy100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Isla-Frey
Getting there
For any parking restrictions that may apply, please check relevant signage.

Facilities

SupermarketAldi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW25.2p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£14
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£10
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£13
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£13
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£11
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£10
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£7.06

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Aldi - Weymouth?

The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Aldi - Weymouth?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point Aldi - Weymouth have?

8 charging sockets: 8 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Aldi - Weymouth busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Aldi - Weymouth?

Amp Map measured 62% uptime here from recorded live status over the last 30 days, across 214 observed charging sessions.

Who operates Pod Point Aldi - Weymouth?

Pod Point Aldi - Weymouth is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Aldi - Weymouth?

The Famous Old Spa, Weymouth (Osprey Charging) is 0.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Aldi - Weymouth?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Aldi - Weymouth?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£10 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Aldi - Weymouth?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£13 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.