Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Bluestone Resorts Ltd

Bluestone, The Grange Canaston Wood, Narberth, SA67 8DE

Pod Point Bluestone Resorts Ltd is an EV charging site in Narberth, Pembrokeshire, run by Pod Point. All 10 of its sockets are 7 kW Type 2, and the published price is £0.46 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 339 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is County Hall Car Park, Haverfordwest (Dragon Charging), 7.1 miles away.

Status

3 of 10 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW10 connectors · 45.6p per kWh3 free7 in use
Bryn-Cleo100% reliabilityCharging
Bryn-Cleo100% reliabilityCharging
Fern-Dane100% reliabilityCharging
Fern-Dane100% reliabilityCharging
Skye-Ruth100% reliabilityCharging
Skye-Ruth100% reliabilityAvailable
Troy-Izzy100% reliabilityAvailable
Troy-Izzy100% reliabilityCharging
Yoko-Frey100% reliabilityCharging
Yoko-Frey100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Bryn-Cleo
Getting there
All Pod Point chargers at Bluestone National Park Resort are for the exclusive use of Bluestone guests

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW45.6p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£19
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£13

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Bluestone Resorts Ltd?

The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Bluestone Resorts Ltd?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Bluestone Resorts Ltd have?

10 charging sockets: 10 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Bluestone Resorts Ltd busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 9 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Bluestone Resorts Ltd?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 339 observed charging sessions.

Who operates Pod Point Bluestone Resorts Ltd?

Pod Point Bluestone Resorts Ltd is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Bluestone Resorts Ltd?

County Hall Car Park, Haverfordwest (Dragon Charging) is 7.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Bluestone Resorts Ltd?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Bluestone Resorts Ltd?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Bluestone Resorts Ltd?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.