EV charging site
Silverstone Green Energy
Units 5 and 6 Rushacre Enterprise Park, Narberth, SA67 7ET
Silverstone Green Energy is an EV charging site in Narberth, Pembrokeshire. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is North Beach, Tenby (Silverstone Green Energy), 9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 3 Oct 2015)
- Phone (from Open Charge Map)
- +44 1834 888 330
- Notes
- Charge point located on business premises; available for public and customer use
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Silverstone Green Energy?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Silverstone Green Energy?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp, Blue Commando (2P+E).
How many charging sockets does Silverstone Green Energy have?
4 charging sockets: 2 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 3 kW Blue Commando (2P+E).
Where is the nearest charger with 50 kW or more to Silverstone Green Energy?
North Beach, Tenby (Silverstone Green Energy) is 9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Silverstone Green Energy?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Silverstone Green Energy?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Silverstone Green Energy?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Gravels Kia
- Town Moor Car Park
- Pod Point Bluestone Resorts Ltd
- Pod Point Bluestone Resorts Ltd - Merlin's Crest
- The Plash Inn
- Cheapest nearby
- Pod Point Bluestone Resorts Ltd · 45.6p per kWh · 7 kW · 2.9 mi
- Fastest nearby
- Town Moor Car Park · 22 kW · 0.4 mi