Pod Point · EV charging site
Pod Point Brecon Beacons National Park
Libanus, Brecon, LD3 8ER
Pod Point Brecon Beacons National Park is an EV charging site in Brecon, Sir Powys, run by Pod Point. All 6 of its sockets are 7 kW Type 2, and the published price is £0.46 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 31 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Brecon (MFG EV Power), 4.5 miles away.
Status
6 of 6 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Kirk-Eddy
- Getting there
- For any parking restrictions that may apply, please check relevant signage.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 45.6p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Brecon Beacons National Park?
The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Brecon Beacons National Park?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Brecon Beacons National Park have?
6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Brecon Beacons National Park busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point Brecon Beacons National Park?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 31 observed charging sessions.
Who operates Pod Point Brecon Beacons National Park?
Pod Point Brecon Beacons National Park is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Brecon Beacons National Park?
Morrisons Brecon (MFG EV Power) is 4.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Brecon Beacons National Park?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Brecon Beacons National Park?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Brecon Beacons National Park?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Pod Point Brecon Beacons - Ffrwdgrech Depot · 22 kW · 3.5 mi