Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Brunswick Street Car Park

George Street, Maidstone, ME15 6NP

Pod Point Brunswick Street Car Park is an EV charging site in Maidstone, Kent, run by Pod Point. All 4 of its sockets are 7 kW Type 2, and the published price is £0.48 per kWh. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 1% uptime and recorded 3 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is InstaVolt/McDonald's Hart Street (InstaVolt Ltd), 0.4 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 7 kW4 connectors · 48p per kWh3 out of service1 status unknown
Iggy-Bryn0% reliabilityOut of order
Iggy-Bryn0% reliabilityOut of order
Lars-Gene2% reliabilityOut of order
Lars-Gene2% reliabilityStatus unknown

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Iggy-Bryn

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW48p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£27
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£19
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£25
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£24
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£20
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£19
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£13

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Brunswick Street Car Park?

The listed price is £0.48/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Brunswick Street Car Park?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Brunswick Street Car Park have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Brunswick Street Car Park busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Brunswick Street Car Park?

Amp Map measured 1% uptime here from recorded live status over the last 30 days, across 3 observed charging sessions.

Who operates Pod Point Brunswick Street Car Park?

Pod Point Brunswick Street Car Park is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Brunswick Street Car Park?

InstaVolt/McDonald's Hart Street (InstaVolt Ltd) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Brunswick Street Car Park?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Brunswick Street Car Park?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Brunswick Street Car Park?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.