Pod Point · EV charging site
Pod Point City way Developments
Hoo St Werburgh, Gillingham, ME3 8QB
Pod Point City way Developments is an EV charging site in Gillingham, Medway, run by Pod Point. Both of its sockets are 7 kW Type 2, and the published price is £0.46 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 25% uptime and recorded 5 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Ship & Trades, Chatham (Osprey Charging), 1.8 miles away.
Status
1 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Myla-Dean
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 45.6p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point City way Developments?
The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point City way Developments?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point City way Developments have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point City way Developments busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point City way Developments?
Amp Map measured 25% uptime here from recorded live status over the last 30 days, across 5 observed charging sessions.
Who operates Pod Point City way Developments?
Pod Point City way Developments is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point City way Developments?
Ship & Trades, Chatham (Osprey Charging) is 1.8 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point City way Developments?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point City way Developments?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point City way Developments?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ship & Trades, Chatham
- McDonald's Terance Butler Avenue
- Energy Solutions
- Tap Zap Go - Medway City Estate
- Cory's Road 1
- Commercial Road 1
- Fastest nearby
- Ship & Trades, Chatham · 160 kW · 1.8 mi