Pod Point · EV charging site
Pod Point Motormall
Cooil Rd, Kirk Braddan, IM4 2AZ
Pod Point Motormall is an EV charging site in Kirk Braddan, Isle of Man, run by Pod Point. It has a single 7 kW Type 2 socket, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Sea Terminal, 2.3 miles away.
Status
Not reporting
Checking status…
Connectors
Type 2 · 7 kW
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Charger ID
- Ross-Shay
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | Free per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Motormall?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Motormall?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Motormall have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
Who operates Pod Point Motormall?
Pod Point Motormall is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Motormall?
Pod Point Sea Terminal is 2.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Motormall?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Motormall?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Motormall?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Jacksons (Isle of man) 2015 Ltd
- Pod Point Shaw’s Brow Car Park
- Pod Point Hospice IOM
- Pod Point Chester Street Car Park
- Pod Point Loch Promenade
- Pod Point Sea Terminal
- Fastest nearby
- Pod Point Sea Terminal · 75 kW · 2.3 mi