Pod Point · EV charging site
Pod Point Stephen Grimwood Electrical Ltd
7-21 Goswell Rd. Barbican, Islington, EC1M 7AH
Pod Point Stephen Grimwood Electrical Ltd is an EV charging site in Islington, Greater London, run by Pod Point. It has a single 7 kW Type 2 socket, and the published price is £0.40 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime here over the last 30 days. 115 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Golden Lane (Outside Peabody Buildings), Islington, 0.2 miles away.
Status
1 of 1 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Quin-Judy
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 39.6p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Stephen Grimwood Electrical Ltd?
The listed price is £0.40/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Stephen Grimwood Electrical Ltd?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Stephen Grimwood Electrical Ltd have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Stephen Grimwood Electrical Ltd busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 1 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Stephen Grimwood Electrical Ltd?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Stephen Grimwood Electrical Ltd?
Pod Point Stephen Grimwood Electrical Ltd is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Stephen Grimwood Electrical Ltd?
Golden Lane (Outside Peabody Buildings), Islington is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Stephen Grimwood Electrical Ltd?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Stephen Grimwood Electrical Ltd?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Stephen Grimwood Electrical Ltd?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Great Sutton Street
- Berry Street
- Golden Lane (Outside Peabody Buildings), Islington
- Saint John Street 29
- Central Street 32
- Dufferin Street
- Fastest nearby
- Golden Lane (Outside Peabody Buildings), Islington · 50 kW · 0.2 mi