Total Energies · EV charging site
Central Street 32
32 Central Street (site 1), Islington, EC1V 8AA
Central Street 32 is an EV charging site in Islington, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 150 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Golden Lane (Outside Peabody Buildings), Islington, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Central Street 32 (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Central Street 32 (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Central Street 32 (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Central Street 32?
Central Street 32 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Central Street 32 (Total Energies)?
Golden Lane (Outside Peabody Buildings), Islington is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Central Street 32 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Central Street 32 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Central Street 32 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Central Street 49
- Golden Lane (Outside Peabody Buildings), Islington
- ubitricity Distributed Energy Systems UK Ltd. 16 Lever Street
- Ironmonger Row
- Great Sutton Street
- ubitricity Distributed Energy Systems UK Ltd. 21 Lever Street, Telfer House
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 16 Lever Street · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Golden Lane (Outside Peabody Buildings), Islington · 50 kW · 0.2 mi