Total Energies · EV charging site
Central Street 49
49 Central Street (site 2), Islington, EC1V 8AB
Central Street 49 is an EV charging site in Islington, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 142 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Golden Lane (Outside Peabody Buildings), Islington, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 23 Jul 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Central Street 49 (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Central Street 49 (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Central Street 49 (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Central Street 49?
Central Street 49 is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Central Street 49 (Total Energies)?
Golden Lane (Outside Peabody Buildings), Islington is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Central Street 49 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Central Street 49 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Central Street 49 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Central Street 32
- ubitricity Distributed Energy Systems UK Ltd. 16 Lever Street
- ubitricity Distributed Energy Systems UK Ltd. 21 Lever Street, Telfer House
- Ironmonger Row
- ubitricity Distributed Energy Systems UK Ltd. 19 Lever Street, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 3A Lever Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 16 Lever Street · 56p per kWh · 5 kW · 0.1 mi