Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point The Podium, Car Park

Northgate St The Podium, Bath, BA1 5AL

Pod Point The Podium, Car Park is an EV charging site in Bath, Bath and North East Somerset, run by Pod Point. All 10 of its sockets are 7 kW Type 2, and the published price is £0.50 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 90% uptime and recorded 452 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Charlotte Street Car Park Hub (GeniePoint), 0.3 miles away.

Status

3 of 10 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 7 kW10 connectors · 50.4p per kWh3 free6 in use1 out of service
Bing-Emry100% reliabilityCharging
Colt-Rhys100% reliabilityCharging
Iris-Bret100% reliabilityAvailable
Jude-Kent100% reliabilityCharging
Lara-Jade100% reliabilityAvailable
Luca-Jake100% reliabilityCharging
Myla-Dirk100% reliabilityCharging
Niki-Levi0% reliabilityOut of order
Suki-Glen100% reliabilityCharging
Tori-Suki100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Bing-Emry
Getting there
The site security team can be contacted 24/7 on 01225444678 or by pushing a help button on the Pay on Foot machines or access control panels.

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW50.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£28
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£20
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£26
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£26
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£22
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£20
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point The Podium, Car Park?

The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point The Podium, Car Park?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point The Podium, Car Park have?

10 charging sockets: 10 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point The Podium, Car Park busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point The Podium, Car Park?

Amp Map measured 90% uptime here from recorded live status over the last 30 days, across 452 observed charging sessions.

Who operates Pod Point The Podium, Car Park?

Pod Point The Podium, Car Park is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point The Podium, Car Park?

Charlotte Street Car Park Hub (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point The Podium, Car Park?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point The Podium, Car Park?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point The Podium, Car Park?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.