GeniePoint · EV charging site
Charlotte Street Car Park Hub
Charlotte Street, Bath, BA1 2NA
Charlotte Street Car Park Hub is an EV charging site in Bath, Bath and North East Somerset, run by GeniePoint. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 11 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Revive_BANES (GeniePoint), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Charlotte Street Car Park Hub (GeniePoint)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Charlotte Street Car Park Hub (GeniePoint) have?
3 charging sockets: 3 × 50 kW CCS, 3 × 50 kW CHAdeMO, 3 × 43 kW Type 2.
Who operates Charlotte Street Car Park Hub?
Charlotte Street Car Park Hub is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Charlotte Street Car Park Hub (GeniePoint)?
Revive_BANES (GeniePoint) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Charlotte Street Car Park Hub (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Charlotte Street Car Park Hub (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Charlotte Street Car Park Hub (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Charlotte Street Car Park
- Charlotte Street Car Park
- Sutton Hotels Francis Hotel
- Revive_BANES
- Pod Point The Podium, Car Park
- Pod Point Hope House
- Cheapest nearby
- Pod Point Hope House · Free · 7 kW · 0.5 mi