Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Wickes / Pets at Home

Gazelle Close Winnersh, Lower Earley, RG41 5HH

Pod Point Wickes / Pets at Home is an EV charging site in Lower Earley, Wokingham, run by Pod Point. All 6 of its sockets are 75 kW CHAdeMO and CCS, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 100% uptime and recorded 295 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Winnersh Park & Ride (Vend Electric), 0.2 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW3 connectors · 64.8p per kWh3 free
Aixa-Lynn100% reliabilityAvailable
Amoy-Najm100% reliabilityAvailable
Lynn-Pola100% reliabilityAvailable
CHAdeMO · 75 kW3 connectors · 64.8p per kWh3 free
Aixa-Lynn100% reliabilityAvailable
Amoy-Najm100% reliabilityAvailable
Lynn-Pola100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
Contactless card at the chargerIn the Pod Point app
Charger ID
Aixa-Lynn

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CHAdeMO75 kW64.8p per kWh
CCS75 kW64.8p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 75 kW CHAdeMO~54 min · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Wickes / Pets at Home?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Wickes / Pets at Home?

Up to 75 kW DC via CHAdeMO, CCS.

How many charging sockets does Pod Point Wickes / Pets at Home have?

6 charging sockets: 3 × 75 kW CHAdeMO, 3 × 75 kW CCS. Live per-socket availability is shown on this page.

When is Pod Point Wickes / Pets at Home busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 9 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Wickes / Pets at Home?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 295 observed charging sessions.

Who operates Pod Point Wickes / Pets at Home?

Pod Point Wickes / Pets at Home is on the Pod Point network.

Where is the nearest other charger with 50 kW or more to Pod Point Wickes / Pets at Home?

Winnersh Park & Ride (Vend Electric) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Wickes / Pets at Home?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Wickes / Pets at Home?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Wickes / Pets at Home?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.