Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Wokingham Borough Council · EV charging site

Wokingham Borough Council

Winnersh Triangle P&R, Lower Deck, Wharfedale Road, Lower Earley, RG41 5RD

Wokingham Borough Council is an EV charging site at Winnersh Triangle P&R, Lower Deck, Wharfedale Road in Lower Earley, Wokingham, run by Wokingham Borough Council and open 24 hours a day. All 8 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 24 charging sessions here over the last 30 days. Amp Map lists 4 other charge points named Wokingham Borough Council in Lower Earley. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Winnersh Park & Ride (Vend Electric), 110 yards away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Wokingham Borough Council’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW8 connectors8 free
DJL40097-1100% reliabilityAvailable
DJL40101-1100% reliabilityAvailable
DJL40399-1100% reliabilityAvailable
DJL40437-1100% reliabilityAvailable
DJL40780-1100% reliabilityAvailable
DKA43184-1100% reliabilityAvailable
DKA43185-1100% reliabilityAvailable
DKA43840-1100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
In the operator's appRFID card
Charger ID
DJL40097-1

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Wokingham Borough Council?

Up to 7 kW AC via Type 2.

How many charging sockets does Wokingham Borough Council have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Wokingham Borough Council open 24/7?

Yes - Wokingham Borough Council is open 24 hours a day, 7 days a week.

When is Wokingham Borough Council busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Wokingham Borough Council?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 24 observed charging sessions.

Who operates Wokingham Borough Council?

Wokingham Borough Council is on the Wokingham Borough Council network.

Where is the nearest charger with 50 kW or more to Wokingham Borough Council?

Winnersh Park & Ride (Vend Electric) is 110 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wokingham Borough Council?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wokingham Borough Council?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wokingham Borough Council?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Wokingham Borough Council · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.