POGO · EV charging site
Argyle Court - Broxburn
Argyle Court, Broxburn, EH52 5EQ
Argyle Court - Broxburn is an EV charging site in Broxburn, West Lothian, run by POGO. Both of its sockets are 200 kW CCS, and the published price is £0.65 per kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Strathbrock Partnership Centre (Chargeplace Scotland), 0.7 miles away.
Status
Not reporting
Checking status…
Connectors
CCS · 200 kW
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- PoGo20221
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
65p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Argyle Court - Broxburn (POGO)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Argyle Court - Broxburn (POGO)?
Up to 200 kW DC via CCS.
How many charging sockets does Argyle Court - Broxburn (POGO) have?
2 charging sockets: 2 × 200 kW CCS. Live per-socket availability is shown on this page.
Who operates Argyle Court - Broxburn?
Argyle Court - Broxburn is on the POGO network.
Where is the nearest other charger with 50 kW or more to Argyle Court - Broxburn (POGO)?
Strathbrock Partnership Centre (Chargeplace Scotland) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Argyle Court - Broxburn (POGO)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Argyle Court - Broxburn (POGO)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Argyle Court - Broxburn (POGO)?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Strathbrock Partnership Centre
- Uphall Railway Station, Uphall
- Macdonalds Houstoun House
- Edinburgh, UK - Newbridge
- Pod Point Western Nissan
- Western Nissan (Newbridge)
- Cheapest nearby
- Pod Point Western Nissan · Free · 7 kW · 2.4 mi
- Fastest nearby
- Edinburgh, UK - Newbridge · 250 kW · 2.3 mi