POGO · EV charging site
Maynard Road
Wincheap Industrial Estate, Canterbury, CT1 3RH
Maynard Road is an EV charging site in Canterbury, Kent, run by POGO. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.56 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 96% uptime and recorded 18 charging sessions here over the last 30 days. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Canterbury (GeniePoint), 0.3 miles away.
Status
3 of 3 available
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 43 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- POGO
- Opening hours
- Not published
- Payment
- In the PoGo Charge appRFID card
- Charger ID
- SEC50119
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
56p per kWh
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Maynard Road (POGO)?
The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Maynard Road (POGO)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Maynard Road (POGO) have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2. Live per-socket availability is shown on this page.
When is Maynard Road (POGO) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Maynard Road (POGO)?
Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.
Who operates Maynard Road?
Maynard Road is on the POGO network.
Where is the nearest other charger with 50 kW or more to Maynard Road (POGO)?
Morrisons Canterbury (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Maynard Road (POGO)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Maynard Road (POGO)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Maynard Road (POGO)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.