Clenergy · EV charging site
Queens Avenue
Queens Avenue, Canterbury, CT2 8AY
Queens Avenue is an EV charging site in Canterbury, Kent, run by Clenergy. Both of its sockets are 7 kW Type 2, and the price is listed as £0.60/kWh (Feb 2025). 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Maynard Road (POGO), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Clenergy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.60/kWh (Feb 2025)(from Open Charge Map, 9 Feb 2025)
- Phone (from Open Charge Map)
- 03330129095
- Notes
- Scan QR code to pay or use their app/a supported RFID. Free parking for 4 hours.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Queens Avenue (Clenergy)?
The listed price is £0.60/kWh (Feb 2025). Prices can change, so check the price at the charger before you start.
How fast is charging at Queens Avenue (Clenergy)?
Up to 7 kW AC via Type 2.
How many charging sockets does Queens Avenue (Clenergy) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Queens Avenue?
Queens Avenue is on the Clenergy network. For site issues, the operator lists 03330129095.
Where is the nearest charger with 50 kW or more to Queens Avenue (Clenergy)?
Maynard Road (POGO) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queens Avenue (Clenergy)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queens Avenue (Clenergy)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queens Avenue (Clenergy)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Roper Yard
- Multi-Storey Car Park
- Westgate Hall Road
- Beverley Road
- Castle Row Car Park
- Ev Dot Watling Street Car Park
- Fastest nearby
- Multi-Storey Car Park · 22 kW · 0.2 mi