EV Dot · EV charging site
Multi-Storey Car Park
Station Road West, Canterbury, CT2 8AN
Multi-Storey Car Park is an EV charging site in Canterbury, Kent, run by EV Dot. Both of its sockets are 22 kW Type 2, and the price is listed as £0.30/kWh. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Canterbury Lane (POGO), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EV Dot
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.30/kWh(from Open Charge Map, 30 Apr 2021)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Multi-Storey Car Park (EV Dot)?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Multi-Storey Car Park (EV Dot)?
Up to 22 kW AC via Type 2.
How many charging sockets does Multi-Storey Car Park (EV Dot) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Multi-Storey Car Park?
Multi-Storey Car Park is on the EV Dot network.
Where is the nearest charger with 50 kW or more to Multi-Storey Car Park (EV Dot)?
Canterbury Lane (POGO) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Multi-Storey Car Park (EV Dot)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Multi-Storey Car Park (EV Dot)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Multi-Storey Car Park (EV Dot)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Canterbury Lane · 56p per kWh · 50 kW · 0.5 mi
- Fastest nearby
- Canterbury Lane · 50 kW · 0.5 mi